Construction data lookup · 38/2026/TT-BXD PL-II
Unit: 1cái · Chapter: AD
AD.31111 is the norm code for "Thi công cọc tiêu Cột km bê tông cốt thép — Cọc tiêu bê tông cốt thép", measured in 1cái, under 38/2026/TT-BXD PL-II issued by B? X�y d?ng — used to estimate material, labor and machinery consumption for cost estimates.
Per the norm set's general notes (see the legal source above).
| Type | Res. code | Resource | Unit | Rate | Grade | Note |
|---|---|---|---|---|---|---|
| Material | — | Xi măng PC30 | kg | 4.03 | — | — |
| Material | — | Thép tròn ɸ6mm | kg | 1.746 | — | — |
| Material | — | Dây thép | kg | 0.017 | — | — |
| Material | — | Cát vàng | m3 | 0.007 | — | — |
Construction data lookup · 38/2026/TT-BXD PL-II
Unit: 1cái · Chapter: AD
AD.31111 is the norm code for "Thi công cọc tiêu Cột km bê tông cốt thép — Cọc tiêu bê tông cốt thép", measured in 1cái, under 38/2026/TT-BXD PL-II issued by B? X�y d?ng — used to estimate material, labor and machinery consumption for cost estimates.
Per the norm set's general notes (see the legal source above).
| Type | Res. code | Resource | Unit | Rate | Grade | Note |
|---|---|---|---|---|---|---|
| Material | — | Xi măng PC30 | kg | 4.03 | — | — |
| Material | — | Thép tròn ɸ6mm | kg | 1.746 | — | — |
| Material | — | Dây thép | kg | 0.017 | — | — |
| Material | — | Cát vàng | m3 | 0.007 | — | — |
| Material | — | Đá dăm | m3 | 0.012 | — | — |
| Material | — | Sơn | kg | 0.015 | — | — |
| Material | — | Ván khuôn 3mm | m3 | 0.0002 | — | — |
| Material | — | Đinh 6cm | kg | 0.015 | — | — |
| Material | — | Vật liệu khác | % | 1 | — | — |
| Labor | — | Nhân công nhóm 2 | công | 0.16 | — | — |
| Material | — | Đá dăm | m3 | 0.012 | — | — |
| Material | — | Sơn | kg | 0.015 | — | — |
| Material | — | Ván khuôn 3mm | m3 | 0.0002 | — | — |
| Material | — | Đinh 6cm | kg | 0.015 | — | — |
| Material | — | Vật liệu khác | % | 1 | — | — |
| Labor | — | Nhân công nhóm 2 | công | 0.16 | — | — |