Construction data lookup · 38/2026/TT-BXD PL-II
Unit: 1m2 · Chapter: AK
AK.32220 is the norm code for "Ốp đá cẩm thạch, đá hoa cương vào tường — Tiết diện đá (m2) ≤ 0,25", measured in 1m2, under 38/2026/TT-BXD PL-II issued by B? X�y d?ng — used to estimate material, labor and machinery consumption for cost estimates.
Per the norm set's general notes (see the legal source above).
| Type | Res. code | Resource | Unit | Rate | Grade | Note |
|---|---|---|---|---|---|---|
| Material | — | Đá | m2 | 1.01 | — | — |
| Material | — | Vữa xi măng | m2 | 0.035 | — | — |
| Material | — | Xi măng trắng | kg | 0.35 | — | — |
| Material | — | Móc sắt | cái | 16 | — | — |
Construction data lookup · 38/2026/TT-BXD PL-II
Unit: 1m2 · Chapter: AK
AK.32220 is the norm code for "Ốp đá cẩm thạch, đá hoa cương vào tường — Tiết diện đá (m2) ≤ 0,25", measured in 1m2, under 38/2026/TT-BXD PL-II issued by B? X�y d?ng — used to estimate material, labor and machinery consumption for cost estimates.
Per the norm set's general notes (see the legal source above).
| Type | Res. code | Resource | Unit | Rate | Grade | Note |
|---|---|---|---|---|---|---|
| Material | — | Đá | m2 | 1.01 | — | — |
| Material | — | Vữa xi măng | m2 | 0.035 | — | — |
| Material | — | Xi măng trắng | kg | 0.35 | — | — |
| Material | — | Móc sắt | cái | 16 | — | — |
| Material | — | Vật liệu khác | % | 2.5 | — | — |
| Labor | — | Nhân công nhóm 3 | công | 0.98 | — | — |
| Machine | — | Máy cắt đá 1,7 kW | ca | 0.25 | — | — |
| Machine | — | Máy khác | % | 5 | — | — |
| Material | — | Vật liệu khác | % | 2.5 | — | — |
| Labor | — | Nhân công nhóm 3 | công | 0.98 | — | — |
| Machine | — | Máy cắt đá 1,7 kW | ca | 0.25 | — | — |
| Machine | — | Máy khác | % | 5 | — | — |